Connect with us at Construction Intel Summit KSA on 23 Nov 2022 | Live | Riyadh

JMC Bridge: A 1200 Metre Marine Bridge Over Narmada River in Jabalpur

Infrastructural

Highlights

Scale

1200 Metre

Client

DBL

Status

Completed

Overview

A 1200 m Marine bridge over the Narmada River, Techture worked with the contractor to develop a BIM implementation workflow and gave way to better management and cost reconciliations through the BIM model. Techture converted the designs into a custom information-rich BIM components, made the construction schedule, extract the quantities and generated 5D simulation for the project.

Deliverables

  • Infrastructural BIM Modelling
  • Structural BIM Modelling
  • MEP BIM Modelling
  • Construction Scheduling and Project Tracking
  • 5D BIM Simulation
  • Clash Detection
  • Photorealistic Rendering
  • Video Walkthrough

Testimonials

quote-icon

The attention to detail and quality of the architectural model that Techture does is really very good. We like to work with companies who have a high focus on delivering good quality and that is where Techture is always on point.

Build Better, Faster

Reach out to us to know how we can help your team utilize the latest technologies in construction and achieve faster and better results.