Connect with us at Construction Intel Summit KSA on 23 Nov 2022 | Live | Riyadh

Delhi Metro Phase 4: Completed Infrastructural Project with 10 Stations

Infrastructural

Highlights

Scale

10 Stations and 12.5 Km of viaduct

Client

Confidential

Status

Completed

Location

Delhi, India

Overview

The Delhi Metro’s Phase 4 (Phase IV), has been planned to provide last-mile connectivity to the new housing hubs in the National Capital Region (NCR) in which Techture has been provided the works of complete BIM modelling, 4D/5D simulation for DC-01 Contract. Techture has also deployed a BIM coordinator on-site for better communication and execution of the project.

Deliverables

  • LOD 300 Model Generation
  • Clash Detection and Coordination
  • Execution and Creation of LOD 400 BIM Model
  • Quantity Estimation
  • Generation of Coordinated Drawings
  • As-Built Model
  • Planned 4D Simulation
  • On-site BIM Coordinator deployment

Testimonials

quote-icon

The attention to detail and quality of the architectural model that Techture does is really very good. We like to work with companies who have a high focus on delivering good quality and that is where Techture is always on point.

Build Better, Faster

Reach out to us to know how we can help your team utilize the latest technologies in construction and achieve faster and better results.