JMC Bridge

Jabalpur, India

Internal

External

JMC bridge

JMC bridge

JMC bridge

JMC bridge

JMC bridge over the Narmada River, Techture worked with the contractor to develop a BIM implementation workflow and gave way to better management and cost reconciliations through the BIM model. Techture converted the designs into a custom information-rich BIM components, made the construction schedule, extract the quantities and generated 5D simulation for the project.

JMC bridge over the Narmada River, Techture worked with the contractor to develop a BIM implementation workflow and gave way to better management and cost reconciliations through the BIM model. Techture converted the designs into a custom information-rich BIM components, made the construction schedule, extract the quantities and generated 5D simulation for the project.

Google
LinkedIn
YouTube
  •   Scale        1200 Metre
  •   Client       DBL
  •   Status      Completed
  •   Location  Jabalpur, India
  •   Sector      Infrastructure

A 1200 m Marine bridge over the Narmada River, Techture worked with the contractor to develop a BIM implementation workflow and gave way to better management and cost reconciliations through the BIM model. Techture converted the designs into a custom information-rich BIM components, made the construction schedule, extract the quantities and generated 5D simulation for the project.

Google
LinkedIn
YouTube
  •   Scale        1200 Metre
  •   Client       DBL
  •   Status      Completed
  •   Location  Jabalpur, India
  •   Sector      Infrastructure

A 1200 m Marine bridge over the Narmada River, Techture worked with the contractor to develop a BIM implementation workflow and gave way to better management and cost reconciliations through the BIM model. Techture converted the designs into a custom information-rich BIM components, made the construction schedule, extract the quantities and generated 5D simulation for the project.

  •   Scale        1200 Metre
  •   Client       DBL
  •   Status      Completed
  •   Location  Jabalpur, India
  •   Sector      Infrastructure

PROJECT OVERVIEW :

A 1200 m Marine bridge over the Narmada River, Techture worked with the contractor to develop a BIM implementation workflow and gave way to better management and cost reconciliations through the BIM model. Techture converted the designs into a custom information-rich BIM components, made the construction schedule, extract the quantities and generated 5D simulation for the project.

DELIVERABLES :

  • Infrastructural BIM Modelling
  • Structural BIM Modelling
  • MEP BIM Modelling
  • Construction Scheduling and Project Tracking
  • 5D BIM Simulation
  • Clash Detection
  • Photorealistic Rendering
  • Video Walkthrough

Google
LinkedIn
YouTube
  •   Scale        1200 Metre
  •   Client       DBL
  •   Status      Completed
  •   Location  Jabalpur, India
  •   Sector      Infrastructure

PROJECT OVERVIEW :

A 1200 m Marine bridge over the Narmada River, Techture worked with the contractor to develop a BIM implementation workflow and gave way to better management and cost reconciliations through the BIM model. Techture converted the designs into a custom information-rich BIM components, made the construction schedule, extract the quantities and generated 5D simulation for the project.

DELIVERABLES :

  • Infrastructural BIM Modelling
  • Structural BIM Modelling
  • MEP BIM Modelling
  • Construction Scheduling and Project Tracking
  • 5D BIM Simulation
  • Clash Detection
  • Photorealistic Rendering
  • Video Walkthrough

Google
LinkedIn
YouTube
AURIC – Aurangabad Industrial City
Integrated Industrial Township at Greater Noida
Menu